Stormwater Pollution Prevention Plan (SWPPP)
A Stormwater Pollution Prevention Plan (SWPPP) is required when the project will impact, disturb or expose one or more acres of soil. The SWPPP must be developed to meet the New York State Standards and Specification for Erosion and Sediment Control (November 2016), as well as the New York State Stormwater Design Manual (January 2015).
The Chemung County Stormwater Coalition has developed two (2) checklists to facilitate the SWPPP Review process. These checklists were adopted by the members of the Coalition at the October 2017 Stormwater Coalition Meeting and are now to be used for all projects subject to the review process.
The first checklist is the pre-submittal checklist. It is intended for use at the beginning phases of a project. It is meant for everyone (owner, developer, municipal staff, consultant and stormwater team) to gather together and agree on certain requirements and components of the Stormwater Pollution Prevention Plan (SWPPP).
The second checklist is the SWPPP Review Checklist. This list is intended for use by the design consultant to ensure all components of the SWPPP are included before submitting the document for review.
A Stormwater Pollution Prevention Plan (SWPPP) is required when the project will impact, disturb or expose one or more acres of soil. The SWPPP must be developed to meet the New York State Standards and Specification for Erosion and Sediment Control (November 2016), as well as the New York State Stormwater Design Manual (January 2015).
The Chemung County Stormwater Coalition has developed two (2) checklists to facilitate the SWPPP Review process. These checklists were adopted by the members of the Coalition at the October 2017 Stormwater Coalition Meeting and are now to be used for all projects subject to the review process.
The first checklist is the pre-submittal checklist. It is intended for use at the beginning phases of a project. It is meant for everyone (owner, developer, municipal staff, consultant and stormwater team) to gather together and agree on certain requirements and components of the Stormwater Pollution Prevention Plan (SWPPP).
The second checklist is the SWPPP Review Checklist. This list is intended for use by the design consultant to ensure all components of the SWPPP are included before submitting the document for review.
Checklist
![]()
|
![]()
|